
Steel Structures (NI) Ltd carried out the structural steel frame on Daisy Hill Hospital, Energy Centre, Newry, for Felix O'Hare, in 2023. Detailing, fabrication and erection were handled from the Dunmurry works.


Previous · Greggs Drive Thru Next · Caparelli at the Old Mill

